At Kiddie Academt in Humble, Texas, we executed the entire concrete scope including a 10,892 SF slab-on-grade which included piers and grade beams foundation and 3,508 SF of concrete sidewalk. Paving work included 6,049 SF of 5-inch, 11,160 SF of 6-inch, and 1,440 SF of 7-inch concrete pavement. Additional concrete foundations were poured for monument signs and flag poles. Light pole bases and steel bollards were also installed as part of our scope. As a result, the project demonstrated excellence and efficiency.